Daily
AI Infrastructure Daily: everything that happened across chips, memory, power, data centers and financing in a 3-minute read, every weekday. Free. Read today's →
NVDA$166.2−4.34%TSM$405.5−1.90%SK hynix₩1,254,000−1.80%Samsung Electronics₩208,000+0.97%MU$798.4−1.59%ASML$1,497.1−2.43%AVGO$364.4+5.54%LITE$624.6−3.61%COHR$232.1−1.04%ANET$206.6+5.06%GEV$818.5+1.27%ETN$359.0−0.44%VRT$209.6+1.52%CEG$282.4+2.79%VST$134.5+0.79%PWR$606.2−0.29%HD Hyundai Electric₩421,000+3.95%MP$37.45+1.96%FCX$60.45−2.69%CCJ$71.78−3.42%MSFT$523.0+0.36%META$623.6−0.82%CRWD$229.9+0.35%SMH$501.7−1.03%SPY$757.1−0.35%
NYSE · US · Specialty Industrial Machinery

GNRC Generac

Large gensets for data centres

Tight but sold off Its supply chain is tightening but the stock is below its 50-day average — price and fundamentals disagree. (automatic: supply-chain trend + price vs 50-day average)
Last close (delayed) · 2026-11-12
$192.9
−0.58% today
1W
+11.9%
1M
−2.6%
3M
−12.1%
YTD
+41.4%
1Y
+18.8%
Off 52w high
−34.7%
Next earnings (est.): 2026-10-28
Market cap$11.38B
P/E (trailing)38.0Forward 13.8
EV / sales2.7×EV/EBITDA 20.1×
Revenue (TTM)$4.62BGrowth 16.2% y/y
Margins38.2%gross · op 8.6%
Free cash flow$335MCash $397M · debt $1.42B
Analyst target$286.6+48.6% upside · 18 analysts · buy
Riskβ 1.84Short 4.7% of float

Fundamentals from public market data, refreshed daily (2026-11-12 22:21 UTC). Figures in reporting currency.

GNRC · price with what management and the data said

Supply tighteningBeat / raiseMiss / cutData releaseEasing Hover a numbered marker for details · dashed lines = 50- and 200-day averages

Timeline: management commentary, data & earnings

8 events
  1. 8
    2026-10-28EarningsBeat / raise

    Reported EPS 2.54 vs 2.43 expected (+4.6% surprise).

  2. 7
    2026-07-29EarningsBeat / raise

    Reported EPS 2.91 vs 2.01 expected (+44.6% surprise).

  3. 6
    2026-04-29EarningsBeat / raise

    Reported EPS 1.8 vs 1.33 expected (+35.5% surprise).

  4. 5
    2026-02-11EarningsMiss / cut

    Reported EPS 1.61 vs 1.77 expected (-9.0% surprise).

  5. 4
    2025-10-29EarningsMiss / cut

    Reported EPS 1.83 vs 2.2 expected (-16.7% surprise).

  6. 3
    2025-07-30EarningsBeat / raise

    Reported EPS 1.65 vs 1.32 expected (+24.6% surprise).

  7. 2
    2025-04-30EarningsBeat / raise

    Reported EPS 1.26 vs 0.97 expected (+30.4% surprise).

  8. 1
    2025-02-12EarningsBeat / raise

    Reported EPS 2.8 vs 2.53 expected (+10.8% surprise).

Earnings history

EPS vs expectations
DateExpected EPSReported EPSSurprise
2026-10-282.432.54+4.6%
2026-07-292.012.91+44.6%
2026-04-291.331.8+35.5%
2026-02-111.771.61−9.0%
2025-10-292.21.83−16.7%
2025-07-301.321.65+24.6%
2025-04-300.971.26+30.4%
2025-02-122.532.8+10.8%
2024-10-311.952.25+15.5%
2024-07-311.21.35+12.3%
2024-05-010.710.88+24.0%
2024-02-142.092.07−0.9%
2023-11-011.511.64+8.4%
2023-08-021.181.08−8.1%
2023-05-030.50.63+25.8%
2023-02-151.751.78+1.5%
2022-11-021.821.75−3.7%
2022-08-032.642.99+13.4%
2022-05-041.922.09+8.6%
2022-02-162.42.51+4.7%
2021-11-022.392.35−1.6%
2021-07-282.322.39+3.0%
2021-04-291.882.38+26.5%
2021-02-111.962.12+8.1%

About Generac

Website ↗

Generac Holdings Inc. designs, manufactures, and distributes energy technology products and solutions worldwide. The company offers residential automatic standby generators, automatic transfer switch, air-cooled engine home standby generators, and liquid-cooled engine generators; Mobile Link, a remote monitoring system for home standby generators; propane tank monitoring solution; and smart home solutions, such as smart thermostats and a suite of home monitoring products. It also provides smart home energy management devices and sensors for heating and cooling system; smart doorbell cameras; and portable and inverter generators; multiple portable battery solutions; manual transfer switches; outdoor power equipment, including trimmers, field and brush mowers, log splitters, stump grinders, chipper shredders, lawn and leaf vacuums, and pressure washers and water pumps; and home energy stor…

9,400 employees · Waukesha, United States

When the grid can't deliver in time, campuses build their own: recip engines, fuel cells and aeroderivatives as a bridge — at higher cost per MWh.

Gas→Recip / fuel cell→Microgrid→Campus

What would prove us wrong. Weakens if interconnection speeds up enough that onsite power loses its time-to-power premium.

Peers at the same bottleneck

Who else supplies this

StockRoleLast1D1MYTDTrend
BE
Bloom Energy
Fuel cells for onsite data-centre power $201.9−3.60%−15.6%+132.4%
CMI
Cummins
Gensets and engines for backup and prime power $455.4−1.70%−13.4%−9.9%
WRT1V.HE
Wärtsilä
Recip engine power plants €26.22+1.83%−12.0%−10.8%
CAT
Caterpillar
Recip gensets and Solar Turbines for onsite power $605.3+0.61%−19.0%+6.6%

Not investment advice. Prices delayed and in local currency. Quotes in "double quotes" are verbatim as reported by the linked source; other commentary is our paraphrase. Earnings dates are estimates.